Supreme Concrete Lintels

Beesley & Fildes concrete lintels are produced to BS EN 845-2-2003 (Part 2: Lintels) where appropriate. The BS states: "Composite lintels should be adequately propped along their span prior to, during, and after the construction of the infill. The props should not be removed until the masonry element of the lintel has reached its design strength, and in no case earlier than 7 days." Constant accurate section cast in steel moulds. Three smooth faces, brushed top face to affix to masonry.

Refine
(17 Items Displayed)
Return to top